Poyle 2, Slough

Poyle 2 was built alongside its sister development Poyle 1, and provides additional office/warehouse space within touching distance of Heathrow Airport.

Clark Degnan were appointed by the Design and Build contractor; Howard Russell Construction Ltd to provide MEP Sub Contractor detailed design from RIBA Stage 4 onwards.

The building was designed to achieve industry best practice in sustainable design and achieved an A rated Energy Performance Certificate and achieved a very high standard of air tightness.

The building services installation included VRF heat recovery heating and comfort cooling, MVHR, and LED lighting with automatic daylight and occupancy control.

Lead
Howard Russell Construction
In
Industrial
Ended
October 2016
Client
Joe Prouse
Started
February 2016
Cost
£10,000,000
Poyle 2, Slough
Poyle 2, Slough
Poyle 2, Slough
Poyle 2, Slough
Poyle 2, Slough
Poyle 2, Slough

Clark Degnan Consulting Engineers were employed by Howard Russell Construction to undertake the full mechanical and electrical building services design for a large industrial project in Slough, London. The project itself comprised of two large industrial buildings situated on two nearby sites, both with fully fitted out offices and large storage facilities. Poyle 1 was also designed to achieve a BREEAM Very Good rating. In order to assist in achieving the projects BREEAM objectives, Craig Degnan of Clark Degnan Consulting Engineers was also appointed as a BREEAM Accredited Professional, and provided essential support to the site team. The service provided by Clark Degnan was exceptional; and their knowledge and experience from a BREEAM perspective was invaluable in achieving the buildings BREEAM rating. Clark Degnan provided support to all of the site based staff and their regular site attendance assisted in a smooth commissioning, witnessing and handover process. We would have no hesitation in recommending their services to others, and we hope to have the opportunity to work together again in the near future.