Poyle 2, Slough
Clark Degnan were appointed by the Design and Build contractor; Howard Russell Construction Ltd to provide MEP Sub Contractor detailed design from RIBA Stage 4 onwards.
The building was designed to achieve industry best practice in sustainable design and achieved an A rated Energy Performance Certificate and achieved a very high standard of air tightness.
The building services installation included VRF heat recovery heating and comfort cooling, MVHR, and LED lighting with automatic daylight and occupancy control.
Project Details
Started: 2016
Completed: 2016